top of page

Ditches and Bridges

Writer's picture: Ruth at Cwtch CabinsRuth at Cwtch Cabins

Updated: Feb 14, 2019

First job today was to build a bridge in the new splay over the ditch that would take 20 ton lorries of stone. Once the ducting and pea gravel was in, the first load of 20 tons was poured on top. Quite a height difference between road edge and our driveway too so needed gradient. We will obviously tarmac and finish properly to roadside before it’s used in angst, this is just to get the huge lorries in. 100 tons gone in today, same again tomorrow. We have moved so much topsoil that things can get a little messy. James and I are both keen to keep the road as clean as possible.


building a bridge over a ditch at the entrance to Cwtch Cabins & Camping and cleaning mud off road

 
 
 

Comments


Our Address

Contact Us

We accept most cards.

Follow Us

Cwtch Cabins & Camping

Much Marcle

Ledbury

Herefordshire

HR8 2NN

TEL: +447981191961   

E-MAIL: hello@cwtchcabins.com

Booking and payment are all online. 

  • Facebook Social Icon
  • Instagram Social Icon

© 2018 by Cwtch Cabins & Camping Proudly created with Wix.com

bottom of page